Full View
Similar items
Brown Corduroy Dog Harness And Leash Luxury Designer Personalized Collar For Small Large Dogs Walking Lead Set With Poop
NZ$29.60
Dog Leash For Large Dog Specific Explosion-proof Punch
NZ$17.86
NZ$21.78 -17% OFF
Personalized Pet Collar Customized Nameplate ID Tag Adjustable Suit Fiber Coffee Brown Cat Dog Collars Lead Leash
NZ$32.28
Personalized Dog Name Collar Soft PU Leather Puppy Cat Bowknot Necklace Anti-lost ID Collars For Small Medium Large Dogs
NZ$29.04
Personalized Dog Name Carved 16 Colors Solid PU Leather Collar For Small Medium Large Dogs Puppy Cat Accessories Red
NZ$26.22
USB Rechargeable Dog Collar, Luminous, Large Pet
NZ$17.37
5M/1.5M/3M/2M Medium Small Long Dog Leash Latex Silk Easy And Convenient Training Big Dual Color Dog Leash 10 Meters
NZ$22.77
Hip Hop Pet Collar Cuban Dog Chain Full Diamond Necklace Lock Gold Silver
NZ$13.66
Flowers Pet Dog Collar Leash PU Leather Cat Collier Chain Neck Strap For Small Middle Large Animal Teddy Chihuahua Pug
NZ$27.26
Training Dog Choking Rope 2 In 1 Collar 150cm P-Shaped Chain Slip Lead Control Leash For Small Large Competition Dogs
NZ$30.15
1.5 1.8 3 6 10 15 20 30 50M Solid Leash For Large Dogs Pet Puppy Walking Training Lead Big Dog Nylon Rope Long Leashes
NZ$49.99
Color : C794-Black 1.5M









Quantity :
Report
Include copyright infringementFree Standard Shipping. See details
Estimated between Mon, Aug 3 and Sat, Aug 8
You can return the product within 30 days of receipt. See details
Shop with confidence
Money Back Guarantee
Get the item you ordered or your money back. Learn more
About this item
Sourced from Pet Supplies Mall
Seller assumes all responsibility for this listing.Item number: 40384255
Item specifics
Item description from the seller
Long Strong Nylon Dog Leash 10m 15m 20m Pet Training Leash For Small Big Dogs Outdoor Walking Puppy Lead Rope Labrodor Supplies
Product:Nylon Dog Leash
Color:Black
Length:1.5m/1.8m/3m/6m/10m/15m/20m/30m/50m*2cm
Feature:Durable,Nylon Material, Long ,Strong,Durable,Convenient to operate
Support:Dropshipping and Wholesale
Suit:Outdoor,Hiking,Walking
Suit for:Small,Medium,Large Dogs,Cats,Puppy ( Yorkie,Chihuahua,French Bulldog,Dachshund,Beagle,Schnauzer,Poodles,Pitbull,Golden retriever,Labrador retriever,German Shepherd)
NOTE
1.Due to manual measurement, please allow a measurement deviation of 0.5-1 cm.
2.Due to the difference in display and lighting effects, the actual color of the item may be slightly different from the color shown on the picture.








Videos
Videos for this product







